- Resurfacing – between Empire
Junction (U.S. 40) and Georgetown
Various lane and shoulder closures,
westbound, Monday through Thursday, 8 a.m. to approximately 8 p.m.
Delays less than 20 minutes.
Various lane closures,
eastbound or westbound, Sunday and Monday, 7 p.m. to 8 a.m. No delays
expected.
- Crossover Construction –
between Dumont and Downieville
Lane closures as needed but
most work outside traffic lanes, eastbound and westbound, Monday through
Thursday, 7 a.m. to 8 p.m. Delays less than 20 minutes for any
required lane closures.
- Ramp Improvements/Meter
Installation – eastbound ramps at Empire Junction (exit 232),
Downieville (exit 234) and east Idaho Springs (exit 241)
Shoulder closures and
occasional right or left lane closure on eastbound I-70 at east Idaho
Springs, Monday through Thursday, 7 a.m. to 5 p.m., Friday 7 a.m. to
noon. No I-70 lane closures between 2 p.m. and 6 p.m.
- Operations Through the
Eisenhower Tunnel
Resurfacing preparations: one
lane closed eastbound and westbound, Monday through Thursday, 9 p.m. to 9
a.m.
Tunnel Lighting Installation: no
lane closures planned for this week.
Tunnel Wash: alternating lane
closures, Monday through Sunday, 7 p.m. to 5 a.m.
Note:
All projects coordinate lane closures to minimize traffic impacts.
- Sediment Control – just west
of the Eisenhower Tunnel
Right lane and shoulder
closed westbound, Monday through Thursday, 7 a.m. to 6 p.m., Friday, 7
a.m. to noon.